
New TopShim run:

version = topshim 2.2.0
date = 2023-05-23
time = 14:27:24.011
command = topshim convcomp

FINE SHIMMING

Parameters:

probe = Z107909_0022
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before= 1.5 Hz, Target= 0.3 Hz, After= 0.4 Hz
echo time must be reduced
Iteration 2: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration 3: FWHM Before= 0.4 Hz, Target= 0.6 Hz, After= 1.0 Hz
Iteration 4: FWHM Before= 1.0 Hz, Target= 0.6 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D shimming, non-spinning) = 0.553

shim changes: 
Z	+466
Z2	+285
Z3	+545
Z4	+1173
Z5	+553
Z6	+4761
Z7	+10678
Z8	+241

duration = 1 min 4 sec
completed successfully
finished Tue May 23 14:28:25 2023


========================================================================
